What are the legislative solutions for cable pooling in Poland?

Some legislative solutions, such as amendments to the existing cable pooling regulations, are linked with the Polish National Recovery and Resilience Plan (reform G1.2.2 “Removal of barriers to the integration of renewable energy sources into electricity grids”).

How will Poland's new grid connection agreement affect DSOs & TSOs?

The amendment also introduces a new type of grid connection agreement designed to address the limited capacity of Poland's infrastructure. Under the proposed rules, DSOs and TSOs will be able to offer flexible connection agreements in areas where the grid is currently constrained.

What are the changes to the regulatory framework for grid connection?

It introduces several important changes to the current regulatory framework for grid connection. The proposal is aimed at optimising the use of existing grid infrastructure and increasing the transparency of the grid connection process. Public consultations of the Project are now open.

Who is the Polish photovoltaics Association?

The Polish Photovoltaics Association, as part of the work of the Working Group on Technical Requirements, together with other

Documents

Applications for establishing conditions of connecting to National Grid Consumer Installation Distribution System Closed Distribution System Standard agreement for the provision of

Poland TSO changes grid connection procedures August 2025

These targeted procedural changes offer a solution to bottlenecks in the grid connection process. In parallel, the TSO and the government are working on a broader

New proposal to amend the Polish Energy Law regarding grid connection

It introduces several important changes to the current regulatory framework for grid connection. The proposal is aimed at optimising the use of existing grid infrastructure and

Polish draft law proposing significant changes to energy-sector

By shortening the validity period for connection conditions, introducing mandatory project milestones and implementing an auction system for released capacities, the new

Poland: New Rules for Connecting to the Grid: What

On March 12, 2025, the Polish government presented a draft amendment to the Energy Law that represents the most extensive reform of the grid connection process in over a

Poland – Grid connection: new framework supporting

These initiatives will soon to be complemented by revised grid connection rules set out in the Energy Law, which will significantly increase the costs of securing access to the grid

Poland New Rules for Connecting to the Grid What Businesses

On March 12, 2025, the Polish government presented a draft amendment to the Energy Law that represents the most extensive reform of the grid connection process in over a

Energy Regulatory Office

As a result of the work carried out within the KET, a number of recommendations for changes to grid connection regulations have been developed, some of which have already found their way

URE on grid connection and cable pooling

The President of the Energy Regulatory Office published Information No. 15/2024 regarding the issues causing the most frequent doubts in the area of connection to the grid,

Poland: A revolution in RES grid connections?

In order to mobilize applicants to proceed with projects faster and thus free the blocked connection capacity, the institution of "milestones" has been introduced — its non

New proposal to amend the Polish Energy Law regarding grid

It introduces several important changes to the current regulatory framework for grid connection. The proposal is aimed at optimising the use of existing grid infrastructure and

Industry Trends

Technical Documentation & Application Guide

Get technical specifications, application guides, and ROI analysis tools for containerized microgrid solutions, mobile energy storage containers, and portable power systems.

Contact B&K BESS Headquarters

Headquarters & Manufacturing

15 Industrialna Street, Włochy District
Warsaw, Poland 02-492

Contact

Sales & General: +48 22 824 4067

Technical Support: +48 607 809 270

Monday - Friday: 8:00 AM - 6:00 PM CET

Saturday: 8:00 AM - 2:00 PM CET